DLT Engineering home page
2021-9-27u2002·u2002The Shanghai Yangtze cable stayed bridge carries both road and rail traffic and has a main span of 730 m that crosses the navigational channel along the link between Shanghai and Chongming Island. DLT were awarded the sub-contract by Second Navigational Engineering Bureau to provide site supervision during erection of bridge deck units.
Get Price