Construction Updates: MARINE PILING - PROCEDURE &
2011-12-12u2002·u2002• Piles required for erection of gantry shall be done by crane barge using Vibro-hammer. • The crane barge shall be shifted and positioned at an accuracy of half meter. • The fabricated liners shall be held in position with help of Vibro-hammer & crane mounted on crane barge, which later shall drive the liner in the seabed.