DLT Engineering home page
2021-9-27u2002·u2002DLT have been awarded the contract to design and supply a second set of DL-SE500/35 bridge deck erection gantry (launching gantry) and DL-TLC500 self propelled transporter plus 2 No 260 tonne straddle carriers for transport and erection of 500 tonne x 35m long precast concrete bridge beams on the Riyadh Metro project, by client FAST Consortium.
Get Price